MacGregor - Marine cargo flow solutions Link_ServiceNetwork


Start
Events
MacGregor News magazine
Newsletters
Subscribe
Press releases
Archive
Bulk carriers
Bulk handling
Container vessels
General cargo ships
Miscellaneous
Naval vessels
Offshore
RoRo ships
Service
Tankers
StartNews & EventsPress releasesArchiveOffshoreCargotec’s upgraded Singapore plant to deliver its first active heave-compensated offshore crane Print     Back

Cargotec’s upgraded Singapore plant to deliver its first active heave-compensated offshore crane

2 December 2009

Advanced offshore equipment deliveries will start to flow from Cargotec’s recently-refurbished manufacturing, assembly and testing plant in Singapore for offshore load handling solutions

January 2010 will see Cargotec’s recently modernised manufacturing, assembly and testing plant for offshore load handling solutions in Singapore deliver its first 150-tonne capacity MacGregor offshore active heave-compensated (AHC) knuckle-jib crane. The crane, which was manufactured on site, will be fully tested at the Cargotec Marine facility prior to delivery to a customer in Asia.

Active heave-compensation technology is an essential function in offshore cranes and other equipment employed on vessels or floating offshore installations doing subsea work; Singapore location is designed to be able to deliver 10 – 20 large MacGregor offshore active heave-compensated cranes per year. 

The completely revamped factory is on a 200m-waterfront site and houses 26,000m2 of modern indoor and sheltered workshop space, equipped with overhead gantry cranes of up to 120-tonne capacity for the manufacture, assembly, testing, repair and service of offshore load handling equipment. This includes: advanced winch systems, such as offshore, towing and anchor-handling winches; mooring systems; and large AHC offshore cranes.

The facility also offers a total of 19,000m2 open yard area with four test foundations, which enable the testing of AHC cranes and other advanced load handling solutions. In addition, the site is equipped with a heavy-duty crawler crane and a transporter for loading and moving large pieces of machinery. A 53m x 15m barge provides additional mooring capacity for the repair and servicing of vessels.

Cargotec’s other state-of-the-art centre for the design, manufacturing, testing and service of advanced offshore load-handling systems is located in Kristiansand, Norway.

For downloading high resolution image please click here.

091202AHC_crane-web
Caption: A 150-tonne MacGregor active heave-compensated subsea crane

[ends]

For further information please contact,
Henrik Vildenfeldt, Sr. Vice President, Offshore Load Handling, Tel. +45 44 544 747
E-mail: henrik.vildenfeldt@cargotec.com  

or

Heli Malkavaara, Communications Manager, Tel. +358 (0)2 4121 252
E-mail: heli.malkavaara@cargotec.com  

Read more: